Real problems. Real clients. Real outcomes.
Every engagement we take on starts with a business problem, not a technology demo. Here's how we've helped clients get more from their systems.
Aligning Global Operations with SAP Business One
Leading European manufacturer of industrial and consumer equipment • ERP Implementation
After acquiring a UK-based company, the client needed to standardise operations across all entities. The UK arm was running a custom finance tool completely separate from the group's systems, with no access to production, inventory, or tax modules. The result: manual reconciliation, human error, and no real-time visibility across the business.
Read the full case study →SAP ByDesign Transformation for a Global Distributor
Global distribution company • ERP Rescue & Optimisation
The client's SAP ByDesign system was live — but it wasn't delivering value. Incorrect system configurations, broken workflows, and inconsistent usage meant that staff had reverted to manual workarounds. Adoption was low, reports were unreliable, and leadership had lost trust in the system.
Read the full case study →Rebuilding SAP ByDesign for a Real Estate Company
Leading real estate company • ERP Rebuild
The client's SAP ByDesign environment had been failing quietly for some time. Wrong configurations, broken workflows, unused modules, low adoption, and unreliable reporting were creating significant operational impact — but because the system was technically live, the problems went unnoticed until they compounded.
Read the full case study →Building an AI-Powered Unified Knowledge Base for a Manufacturer
SME manufacturer • AI Consulting
The client runs four separate business systems across their operations — covering production, finance, CRM, and inventory. Leadership had no single place to get answers. Every decision required pulling data manually from multiple platforms, cross-referencing spreadsheets, and chasing colleagues for context.
Read the full case study →Optimising Packaging Costs with Data Science & AI
Packaging company • Data Science & AI Consulting
The client had been using fixed packaging sizes for years — a standard set of box dimensions applied regardless of what was being shipped. This meant products were frequently over-packaged, leading to wasted materials, higher shipping costs due to volumetric weight charges, and unnecessary labour in handling oversized parcels.
Read the full case study →Facing similar challenges?
Book a free 30-minute audit. We'll review your current setup and identify the best way forward.
